|
|
|
|
|
|
|
|
|
 |
Pan-West Pte Ltd.
(www.pan-west.com).
Golf products distribution and retail giant Pan-West teams up
with Kingdee to drive Asia Pacific growth. Download
the success story here. |
|
|
 |
Fuda
(www.fuda.com).Kingdee
and Vacumm Cleaner Giant Fuda team up to keep head in competitive
electronics market. Download
the success story here.
|
|
|
|
|
|
|
|
|
|
|
 |
Topband
(www.topband-e.com).
Kingdee helps Topband, a leading home appliance controller venoder
in China, to reach the world's home appliance controller market.
Download
the success story here. |
|
|
 |
China Travel Service (Holdings) HK. Ltd
(www.hkcts.com).
Kingdee provides EAS (J2EE version) for China Travel Service
(Holdings) HK. Ltd (CTS) covering most of their branches and
subsidiaries worldwide. |
|
|
|
|
|
|
|
|
|
|
 |
China Merchants Group
(www.cmhk.com). Kingdee provids K/3
ERP including HR to most of its branches and subsidiaries in
Hong Kong and mainland China. |
|
|
 |
TCL Group Corporation
(www.tcl.com). Kingdee provides TCL Group, a 3-billion-US-dollar-revenue multi-national company with sales of TV, telephone and computer, with its advanced ERP solutions, including Financial system for group company, ERP system for TV factory, DRP system for TCL distribution channel and KM system for group EIP and OA. View the success story here. |
|
|
|
|
|
|
|
|
|
|
 |
Kao Singapore project
(www.kao.co.jp).
Kingdee develops outsourcing project for Kao Singapore. In 1991
this project used about 20 developers and lasted for less than
1 year. |
|
|
 |
Omron Asian subsidiary project
(www.omron.com).
Kingdee develops the software-outsourcing project in 1992
by using 30 developers and provides the customer with designing,
coding and testing.
|
|
|
|
|
|
|
|
|
|
|
 |
Kohwa Japanese.Project
(www.kohwa-mold.com).
Kingdee K/3 ERP system has been applied in the sales, finance,
logistics, and workshop departments.It made significant achievements
in product batch tracking, cost control, time and operation,
and scheduling. |
|
|
 |
CCB Bank. Group.Project
(www.ccb.cn). Kingdee Bank industry solution helps CCB to know about the expenditures of the departments and products throughout the bank in an all-round and real-time manner. It plays a positive and healthy role in adjusting the operation strategies in time, reducing operation cost, heightening the key business, and improving the decision-making capability. View the success story here. |
|
|
|
|
|
|
|
|
|
|
 |
Robina .Sino- foreign joint venture.Project
(www.robinawood.com/index.html). Kingdee K/3 effectively helps Robina wood to solve a variety of problems during its high-speed development, Such as. reconciliation inaccuracy between the finance and the inventory, conflicts of the procurement, warehouse, and requirement department, and difficulty of cost accounting and statistical reports. View the success story here. |
|
|
| |
Shanghai PL . Sino- foreign joint venture. Project.
Kingdee K/3 helps Shanghai PL Technologies to solve the problems in production and management and make a successful step ahead towards information-based management. View the success story here. |
|
|
|
|
|
|
|
|
|
|
 |
F. L. Smidth Denmark .Project
(www.flsmidth.com). Kingdee K/3 helps F.L. Smith to construct the personalized, multi-lingual outsourcing business.Consequently, It shoted upwards F.L. Smith’s work efficiency. View the success story here. |
|
|
 |
TianJinToyo . Sino- foreign joint venture .Project
(www.tjtoyoink.com.cn). Kingdee K/3 helps Tianjin Toyo to achieve precision control of the production management. Kingdee K/3 procured goods inspection, completion inspection, and inventory sampling inspection. View the success story here. |
|
|
|
|
|
|
|
|
|
|
 |
XJ. Group. Project
(www.xjckyb.com). Kingdee K/3 assists XJ Group Corporation in solving the production cost distortion that results from unreasonable expenditure distribution methods, and enables the product line managers to acquire authentic and effective cost data from the accounting department. View the success story here. |
|
|
 |
Kingway.Group. Business Circulation.Project
(www.kingwaybeer.com/en). Kingdee K3 enables Kingway to
achieve the integration of financial operation to be able to
share data of purchase, storage and marketing with the finance
system in a timely and accurate way. |
|
|
|
|
|
|
|
|
|
|
 |
SAHM, Group. Mechanical manufacturing .Project
(www.sahm.fjfair.com).
Kingdee K3 helps SAHM to raise the planning accuracy rate from
93% to 98% and the completeness rate of ancillary materials
from 90% to 96%. |
|
|
 |
Tangshan Guofeng Steel .Group.Steel .Project
(www.tangsteel.com).
Kingdee K/3 BOS helps Guofeng Steel to realize an information
integration platform for the operations including purchase,
production, marketing, measurement and quality inspection in
the long process of steel-making from bulk raw materials and
fuels to wiring. Significantly, Guofeng Steel increases the
overall operational efficiency by k/3. |
|
|
|
|
|